Senouci, A.B. and Mubarak, S.A. (2016) “Multiobjective optimization model for scheduling of construction projects under extreme weather”, Journal of Civil Engineering and Management, 22(3), pp. 373–381. doi:10.3846/13923730.2014.897968.