Lee, M. and Lee, U.-K. (2020) “A framework for evaluating an integrated BIM ROI based on preventing rework in the construction phase”, Journal of Civil Engineering and Management, 26(5), pp. 410–420. doi:10.3846/jcem.2020.12185.