Time reduction effects of steel connected precast concrete components for heavily loaded long-span buildings. Journal of Civil Engineering and Management, [S. l.], v. 26, n. 2, p. 160–174, 2020. DOI: 10.3846/jcem.2020.11673. Disponível em: https://journals.vilniustech.lt/index.php/JCEM/article/view/11673. Acesso em: 11 may. 2025.