Abdul-Rahman, H., Wang, C., & Muhammad, N. B. (2011). Project performance monitoring methods used in malaysia and perspectives of introducing EVA as a standard approach. Journal of Civil Engineering and Management, 17(3), 445-455. https://doi.org/10.3846/13923730.2011.598331