Koo, C., Hong, T., & Kim, S. (2015). An integrated multi-objective optimization model for solving the construction time-cost trade-off problem. Journal of Civil Engineering and Management, 21(3), 323-333. https://doi.org/10.3846/13923730.2013.802733