Ho, C., Zabinsky, Z. B., & Kim, Y.-W. (2026). Scheduling the production of prefabrication construction supply chains considering variable delivery times. Journal of Civil Engineering and Management, 32(3), 415–432. https://doi.org/10.3846/jcem.2026.26156