(1)
Andrić, J. M.; Mahamadu, A.-M.; Wang, J.; Zou, P. X. W.; Zhong, R. The Cost Performance and Causes of Overruns in Infrastructure Development Projects in Asia. JCEM 2019, 25 (3), 203-214. https://doi.org/10.3846/jcem.2019.8646.