(1)
Hong, W.-K.; Kim, G.; Lim, C.; Kim, S. Development of a Steel-Guide Connection Method for Composite Precast Concrete Components. JCEM 2017, 23 (1), 59-66. https://doi.org/10.3846/13923730.2014.975740.