(1)
Osman, H.; Ammar, M.; El-Said, M. Optimal Scheduling of Water Network Repair Crews Considering Multiple Objectives. JCEM 2017, 23 (1), 28-36. https://doi.org/10.3846/13923730.2014.948911.