(1)
Xiao, X.; Wang, F.; Li, H.; Skitmore, M. Modelling the Stochastic Dependence Underlying Construction Cost and Duration. JCEM 2018, 24 (6), 444-456. https://doi.org/10.3846/jcem.2018.5712.