(1)
Lin, M.-C.; Tserng, H. P.; Ho, S.-P.; Young, D.-L. Developing a Construction-Duration Model Based on a Historical Dataset for Building Project. JCEM 2011, 17 (4), 529-539. https://doi.org/10.3846/13923730.2011.625641.