(1)
Cho, K.; Hong, T.; Hyun, C. T. Space Zoning Concept-Based Scheduling Model for Repetitive Construction Process. JCEM 2013, 19 (3), 409-421. https://doi.org/10.3846/13923730.2012.757561.