(1)
Yousefi, V.; Haji Yakhchali, S.; Khanzadi, M.; Mehrabanfar, E.; Ĺ aparauskas, J. Proposing a Neural Network Model to Predict Time and Cost Claims in Construction Projects. JCEM 2016, 22 (7), 967-978. https://doi.org/10.3846/13923730.2016.1205510.