(1)
Ho, C.; Zabinsky, Z. B.; Kim, Y.-W. Scheduling the Production of Prefabrication Construction Supply Chains Considering Variable Delivery Times. JCEM 2026, 32 (3), 415–432. https://doi.org/10.3846/jcem.2026.26156.