(1)
Senouci, A. B.; Mubarak, S. A. Multiobjective Optimization Model for Scheduling of Construction Projects under Extreme Weather. JCEM 2016, 22 (3), 373-381. https://doi.org/10.3846/13923730.2014.897968.