(1)
Lee, C.; Won, J. Analysis of Construction Productivity Based on Construction Duration Per Floor and Per Gross Area, With Identification of Influential Factors. JCEM 2021, 27 (3), 203-216. https://doi.org/10.3846/jcem.2021.14514.