(1)
Lee, H.-H.; Kim, K.-H.; Son, S.; Park, K.; Kim, S. Time Reduction Effects of Steel Connected Precast Concrete Components for Heavily Loaded Long-Span Buildings. JCEM 2020, 26 (2), 160-174. https://doi.org/10.3846/jcem.2020.11673.