[1]
Wang, W.-C. et al. 2017. Conceptual cost estimations using neuro-fuzzy and multi-factor evaluation methods for building projects. Journal of Civil Engineering and Management. 23, 1 (Jan. 2017), 1–14. DOI:https://doi.org/10.3846/13923730.2014.948908.