[1]
Xiao, X. et al. 2018. Modelling the stochastic dependence underlying construction cost and duration. Journal of Civil Engineering and Management. 24, 6 (Oct. 2018), 444–456. DOI:https://doi.org/10.3846/jcem.2018.5712.