[1]
Ho, C. et al. 2026. Scheduling the production of prefabrication construction supply chains considering variable delivery times. Journal of Civil Engineering and Management. 32, 3 (Apr. 2026), 415–432. DOI:https://doi.org/10.3846/jcem.2026.26156.