[1]
Park, S.-J. et al. 2025. Prediction of sewage pipeline construction duration by introducing machine learning and deep learning approaches. Journal of Civil Engineering and Management. 31, 7 (Aug. 2025), 687–709. DOI:https://doi.org/10.3846/jcem.2025.23472.