[1]
2020. Time reduction effects of steel connected precast concrete components for heavily loaded long-span buildings. Journal of Civil Engineering and Management. 26, 2 (Feb. 2020), 160–174. DOI:https://doi.org/10.3846/jcem.2020.11673.