[1]
C.-W. Koo, T. Hong, C.-T. Hyun, S. H. Park, and J.- oh Seo, “A study on the development of a cost model based on the owner’s decision making at the early stages of a construction project”, IJSPM, vol. 14, no. 2, pp. 121–137, Apr. 2010, doi: 10.3846/ijspm.2010.10.