STRAGYS, Modestas. The preliminary design and technical-economic efficiency of the two-level branched cable-stayed bridge. Engineering Structures and Technologies, [S. l.], v. 11, n. 1, p. 17–24, 2019. DOI: 10.3846/est.2019.8858. Disponível em: https://journals.vilniustech.lt/index.php/EST/article/view/8858. Acesso em: 9 may. 2025.